the back, front and collar/edging are finished. I have 2 balls and some bits left, which doesn't seem a lot. the sleeves are only elbow length but with a turn back cuff. I'm knitting them downwards from the sleeve head and the length will depend on how much yarn there is.
Pages
a busy domestic blog of knitting, sewing and all kinds of needlecrafts, cooking my garden produce and preserving it
Tuesday, 16 February 2010
pink mohair jacket
the back, front and collar/edging are finished. I have 2 balls and some bits left, which doesn't seem a lot. the sleeves are only elbow length but with a turn back cuff. I'm knitting them downwards from the sleeve head and the length will depend on how much yarn there is.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment